Preparing an EIA for an addendum to the 2D Seismic Exploration in Blocks 2-3, onshore, Albania (developer Shell Upstream Albania BV).

EMA role under this assignment include, revising the existing reports and data, conduct baseline site surveys; elaborate the impact analyses and the Environmental Management Plan in the report and prepare and assist in environmental approval of the project